DIY

Chainplates ready to be caulked.

How to Caulk Chainplates on your Sailboat

Chainplates connect the shrouds to the hull. In order to perform their function, they attach the shrouds, above the deck, to the hull frames, below the deck. Accordingly, most sailboats have pierced decks to let the chainplates through. This means that if they are not caulked, water can creep in...

A mini standing rigging adjustment guide

The techniques for adjusting standing rigging are as old as the history of sailing itself. Some consider it an art, while others prefer to leave it to the professionals. The prevailing view is that improper adjustment will slow the boat down and may even be dangerous. A few tips can...

A Liferaft Installed on Deck.

Tiller Head, Liferaft and Guardrails

Here is a quick mash-up text of three « small » installations. The installs were fairly straightforward, except perhaps some specific dimensions that are described below. Tiller Head Install The former tiller has a shaft of 7/8″, while the new one has a shaft of 1″. This means that a...

Yanmar 3GM20.

Diesel Engines: First Principles

A diesel engine relies on a controlled explosion in four stages: intake, compression, explosion and output. Unlike gas, diesel ignites on compression alone in the cylinder: no spark plug is needed.